RMA Soils completed a Geotechnical Investigation for the construction of a 2.5 Giga Watt Solar Farm at Bulli Creek, west of Millmerran.
The solar farm is to be constructed over 3 rural properties totalling 5400 hectares. The investigation included drilling several boreholes across the 3 properties and taking soil and water samples to determine the soil engineering characteristics, soil and water chemistry testing, material strength for pavement design and soil resistivity.